Santamaria Concrete completed asphalt restoration work along a major roadway corridor in Northern California as part of a utility installation and restoration project. The work focused on restoring pavement impacted by underground utility trenching, requiring precise coordination with traffic control operations and ongoing roadway activity.
The project involved milling, trench restoration, and placement of hot mix asphalt to meet local agency standards and ensure long-term pavement performance.
Scope of Work:
Project Highlights:
Site & Engineering:
The project required precise restoration of areas impacted by utility trenching to ensure proper roadway performance. All surfaces were milled and replaced to match existing grades, providing a smooth and durable finish.
Logistics & Execution:
Due to the active roadway and ongoing utility work, careful coordination was required between paving crews, utility teams, and traffic control. Work was performed in phases to maintain traffic flow while completing restoration efficiently.
Safety:
All work was performed following strict safety procedures, including traffic control measures and coordination with utility crews. Special attention was given to working around open trenches and active roadway conditions.