Santamaria Concrete completed concrete and asphalt improvements for a waterfront boat launch facility in Northern California. The work included curbs, curb and gutter, sidewalks, ADA improvements, light pole foundations, asphalt paving, seal coating, striping, and related site improvements.
Santamaria Concrete constructed a cast-in-place concrete retaining wall in Napa, California as part of PG&E’s former Manufactured Gas Plant (MGP) environmental remediation project, including reinforcing steel installation, formwork, and structural concrete placement.
Santamaria Concrete completed asphalt restoration work along a major roadway corridor in Northern California as part of a utility improvement project. The work included milling, trench restoration, and hot mix asphalt placement to restore pavement impacted by underground utility operations, performed under active traffic conditions.
Santamaria Concrete performed emergency roadway and drainage improvements for Caltrans along a major highway corridor in Northern California. The work included culvert removal and replacement, grading, drainage restoration, and coordination of traffic control and environmental requirements under emergency conditions.
Santamaria Concrete performed emergency roadway and drainage repairs for Caltrans along El Camino Real in Northern California. The project included excavation, culvert repair, and asphalt restoration, completed under both daytime and nighttime operations to accelerate repairs and restore roadway safety.